Yahoo Finance 30/03/2021

SURREY, BC / ACCESSWIRE / March 31, 2021 / Condor Gold («Condor Gold», «Condor» or the «Company»)(AIM:CNR)(TSX:COG) is pleased to announce its audited results for the year ended 31 December 2020 and provides notification that the Annual General Meeting of shareholders of the Company will be held at 3:00 p.m. on 12 May 2021 at 7/8 Innovation Place, Godalming, Surrey, GU7 1JX, United Kingdom.

Due to the ongoing Covid-19 pandemnic and national restrictions, shareholders will not be able to attend the Annual General Meeting in person at the physical location. However, they will be able to attend in person electronically by resgitering with the Company beforehand. All shareholders are encouraged to vote by proxy before the Annual General Meeting.

The Company has published the formal notice of meeting (the «Notice») on its website (www.condorgold.com) together with the related voting proxy form for use by shareholders. A copy of the Notice, together with the proxy voting form, the Annual Report for the year ended 31 December 2020 and the accompanying Management’s Discussion and Analysis will be posted to all shareholders who have electred to receive them in hard copy.

HIGHLIGHTS FOR THE YEAR ENDED 31 DECEMBER 2020

  • On 10 January the Company announced the appointment of SP Angel Corporate Finance LLP as broker to the Company.
  • The award of the environmental permit for the Mestiza open pit was announced by the Company on 29 April. The Mestiza open pit hosts 92Kt at a grade of 12.1g/t gold (36,000oz contained gold) in the Indicated Mineral Resource category and 341Kt at a grade of 7.7g/t gold (85,000oz contained gold) in the Inferred Mineral Resource category. The Mestiza open pit is situated less than 4 kilometres from the location of the permitted processing plant for the La India open pit.
  • The award of the environmental permit for the America open pit was announced by the Company on 6 May. The America open pit hosts 114Kt at a grade of 8.1 g/t gold (30,000 oz contained gold) in the Indicated Mineral Resource category and 677Kt at a grade of 3.1 g/t gold (67,000 oz contained gold) in the Inferred Mineral Resource category. The America open pit compliments the already permitted La India and Mestiza open pits.
  • Following the permitting of the Mestiza and America open pits, together with the La India open pit Condor has 1.12M oz gold open pit Mineral Resources permitted for extraction (8,583Kt at 3.3g/t gold for 903,000 oz gold in the Indicated category and 1,901Kt at 3.6g/t gold for 220,000 oz gold in the Inferred category), inclusive of a Mineral Reserve of 6.9Mt at 3.0g/t gold for 675,000 oz gold.
  • On 28 May the Company announced a placing of 18,082,192 units, comprising an equivalent number of ordinary shares at a price of 36.5p per share, and 9,041,090 warrants with an exercise price of 40p, to raise in aggregate gross proceeds of £6,600,000 before expenses.
  • On 13 August the Company announced that it had made significant progress in de-risking La India project through purchase of land in and around the permitted La India open pit mine site area and provided an update on key elements in advancing the project:
  • Acquired 85% of the land within the permitted La India open pit mine site infrastructure, including the key areas of the location of the processing plant, tailings storage facility, open pit, waste dump area, explosive magazine.
  • Tailings Storage Facility and 2 water retention ponds are being fully designed by Tierra Group Inc. – 40% of the engineering designs are completed.
  • The design of the site wide water balance including a surface water management plan is underway and has been awarded to SRK Consulting (UK) Ltd.
  • Preliminary designs for the layout of the mine site infrastructure including, in some detail, the designs for the location of the processing plant have been completed.
  • Mine and waste dump schedules for a number of mining scenarios have been completed.
  • The power studies have been progressed and several meetings held with the Ministry of Energy and Mines.
  • On 27 October the commencement of a ground investigation programme on the tailings storage facility, water retention reservoir and plant location was announced by the Company. This comprises 20 geotechnical drill holes and 58 test pits and is a component of the Ministry of the Environment and Natural Resources («MARENA») permit conditions for La India Open Pit.
  • The commencement of a 4,000 metre in-fill diamond drilling programme at the La India open pit was announced by the Company on 7 December while on 16 December the Company announced that it had initiated site preparation activities at the location of the processing plant at La India.